Monday, March 11, 2019
Lucent Technologies
Case analysis on lucent Technologies spherical Supply range of a function Management By, ROOPANVI DANDU Lucent Technologies Global Supply Chain Management Lucent technologies are a manufacturing company that was a divulge of American Telephone and Telegraph Corporation (AT& antiophthalmic factorereT) until 1996. Lucents main(prenominal) mathematical product was the 5ESS switch. The switch was worlds most reliable and widely apply switching system. Prior to 1996 the Asiatic planning compass has not been a high priority.The implore for Asian joint ventures was easily met by the manufacturing social unit in United States. The high volume of production in okay City led to low production costs. in like manner AT&Ts large cash flow from the phone bills had insulated its manufacturing prolongation from the consequences of inefficient assent management and long condemnation delivery times. Lucents independence made them loose the deep pockets of AT&T.At the same time m any other factors like the booming Asian marketplace, significant price erosion for telecommunications equipment, original part resourcing and manufacturing capabilities forced indeed to redesign the Asian supply chain. After the redesign the results were dramatic. 82 percent of part were sourced with Asia, which led the factory to be three times as productive, inventory days of sales fell by more than half, time difference and long distance that had inhibited responsiveness were eliminated.Also due to its interior(a) knowledge of product cost, the factory was able to steer many bids towards configurations in which the switch had great cost aimfulness leading to competitive advantage studyed to win the bid. They were many factors that led to revisit the Asia supply chain strategy. Due to unprecedented growth in cellular and Internet sectors, components demand outstripped supply, and huge material shortage developed. Leading edge procurement arrangements were painfully tested and in some cases broke down.The main five questionable areas were sole sourced component lead times more than doubled, inventories increased by about 25 percent as assemblies could not be completed, the chinaware factory had to commit to early parts delivery to ensure availability, product shipment to costumers were jeopardized and orders were at risk due to an inability to ship on time, premium prices were required in order to obtain expedited shipments of missing parts. Also the contract manufacturers were starting to get more involved in train telecommunication electronics.The switch was reaching the mature part of its life cycle. all told these external and internal factors forced to rethink about the strategy. I would advocate reevaluation of supply chain to reduce the competition. To reduce material shortage I would suggest to design new technology that uses general products, forecast the demand, use contract manufacturers where their own manufacturing assets are not so profitable, order the parts beforehand so that premium prices can be avoided for missing parts.The main lesson learned form this case study would be to reevaluate your supply chain strategy every few years to be happy and ahead of the competitors. In order to effectively balance risk and opportunity, manufacturers, distributors, and retailers need to periodically rethink their strategies. . To improve the Supply Chain network enhance Collaboration should be implemented. It would dramatically minimize the delays and also reduces the costs. Work with suppliers to perform contingency plans. Also to make supply chain more on the table increase product component standardization.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment